MT 513 Field Specifications
28. Field 69a: Period: Price Calculation Period
FORMAT
Option A |
:4!c//8!n/8!n |
(Qualifier)(Date)(Date) |
Option B |
:4!c//8!n6!n/8!n6!n |
(Qualifier)(Date)(Time)(Date)(Time) |
Option C |
:4!c//8!n/4!c |
(Qualifier)(Date)(Date Code) |
Option D |
:4!c//8!n6!n/4!c |
(Qualifier)(Date)(Time)(Date Code) |
Option E |
:4!c//4!c/8!n |
(Qualifier)(Date Code)(Date) |
Option F |
:4!c//4!c/8!n6!n |
(Qualifier)(Date Code)(Date)(Time) |
Option J |
:4!c//4!c |
(Qualifier)(Date Code) |
PRESENCE
Optional in optional subsequence C1
QUALIFIER
(Error code(s): T89)
Order |
M/O |
Qualifier |
R/N |
CR |
Options |
Qualifier Description |
1 |
O |
PRIC |
N |
|
A, B, C, D, E, F, or J |
Price Calculation Period |
DEFINITION
This qualified generic field specifies:
PRIC |
Price Calculation Period |
Period used to determine the average price of a security. |
CODES
In option C or D or E or F or J, Date Code must contain the following code (Error code(s): K69):
OPEN |
Open-Dated |
Date has not been established. |
NETWORK VALIDATED RULES
Date must be a valid date expressed as YYYYMMDD (Error code(s): T50).
Time must be a valid time expressed as HHMMSS (Error code(s): T38).