MT 707 Field Specifications

13. Field 39A: Percentage Credit Amount Tolerance

FORMAT

Option A 2n/2n (Tolerance 1) (Tolerance 2)

PRESENCE

Conditional (C4 and C6)

DEFINITION

When the credit amount tolerance is being amended, this field specifies the new tolerance relative to the documentary credit amount as a percentage plus and/or minus that amount.

USAGE RULES

Tolerance 1 specifies a positive tolerance, Tolerance 2 specifies a negative tolerance.